Abdulmajid, S A D (1967) Resource forecasting models for private housing projects, Unpublished PhD Thesis, , The University of Manchester.

Adams, C D (1995) Procurement of microtunnelling projects, Unpublished PhD Thesis, , The University of Manchester.

Adul-Hamid, R (1996) Construction duration prediction using neural network methodology, Unpublished PhD Thesis, , The University of Manchester.

Coram, W R (1997) The privatisaton of the property services agency, Unpublished PhD Thesis, , The University of Manchester.

Eldosoky, A I (1987) Dealing with uncertainty in construction projects with particular reference to Egypt, Unpublished PhD Thesis, , The University of Manchester.

Fenn, F P (1999) An aetiology of construction disputes, Unpublished PhD Thesis, , The University of Manchester.

Holden, S L (2021) Land, materials, and construction site: Decommodification through alternative construction, Unpublished PhD Thesis, , The University of Manchester.

Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the p.R. Of China, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Luo, J and Gale, A (1998) The transitional construction industry and sino-foreign construction joint ventures in the p. R. Of China, Unpublished PhD Thesis, , The University of Manchester.

Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance, Unpublished PhD Thesis, , The University of Manchester.

  • Type: Thesis
  • Keywords: uncertainty; revenues; financing; life cycle; project appraisal; project finance; public private partnerships; risk management; Germany; United Kingdom; financial analysis; net present value; simulation; duration; partnership; private finance initiative
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2799630797
  • Abstract:
    Project finance provides a method of financing projects, relying on the revenues generated by the project to repay lenders. Organisations utilising project finance are exposed to risk and uncertainty over the life cycle of the project. The commercial viability of such projects can be assessed in terms of their economic parameters, those being the Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PB) and Cash Lock Up (CLU).In both the United Kingdom and Germany under the relevant Private Finance Initiatives (PFI’s), usually on the basis of Public-Private Partnerships (PPP’s), projects now are being procured or considered in bundles rather than on an individual, stand-alone basis. For the purpose of financial analysis, bundled projects can be considered as portfolios of projects. When projects are considered individually, some may be commercially viable as stand-alone projects and others may not. However, when projects are bundled together, an overall portfolio of projects may meet a promoter’s Minimum Acceptable Rate of Return (MARR) and be deemed commercially viable.This study reviews the concepts of project finance, risk management, portfolio management and the PFI in relation to assessing the commercial viability of portfolios of projects. A questionnaire is used to determine current methods of assessing portfolios, in this study respondents from 60 organisations provided data which was duly analysed by the author.A mechanism is developed to determine the economic parameters of a portfolio or bundle of projects by assessing the worst, base and best case scenarios based on the risks associated with each individual project forming part of the portfolio.The computer software, Computer Aided Simulation for Project Appraisal and Review (CASPAR) is combined with spreadsheets to model portfolios and simulate different scenarios in terms costs, revenues, durations and financial instruments.

Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites, Unpublished PhD Thesis, , The University of Manchester.

Ng, S-t T (1996) Case-based reasoning decision support for contractor prequalification, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Nour, H A (2003) An information approach for enhancing the health and safety file, Unpublished PhD Thesis, , The University of Manchester.

Parvar, J (2003) Neural networks decision support system (decision to bid), Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Peacock, W S (1990) Site investigation procedures and risk analysis, Unpublished PhD Thesis, , The University of Manchester.

Samo, S R (1999) Energy conservation in UK housing and the effect of building regulations, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Sansone, R (2020) Latent matters: Megaprojects and political imaginaries in post-revolution Tunis, Unpublished PhD Thesis, , The University of Manchester.

Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach, Unpublished PhD Thesis, , The University of Manchester.

Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam, Unpublished PhD Thesis, , The University of Manchester.

Suraji, A (2001) Development and validation of a theory of construction accident causation, Unpublished PhD Thesis, , The University of Manchester.

Tipple, C (1993) An analysis of the development of the construction industry since the 18th century, Unpublished PhD Thesis, , The University of Manchester.

Wearne, S H (1969) Organization of large engineering design departments, Unpublished PhD Thesis, , The University of Manchester.

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects, Unpublished PhD Thesis, , The University of Manchester.